The Pipeline

Powered Land, Secured Ahead Of Demand.

Thirty-six hundred acres across three markets, with power secured before the market prices it.

Pipeline is conviction made visible. TerraWatt’s portfolio is assembled around the discipline that defines our thesis: powered land in North American markets where capacity is still available, secured ahead of demand, in a structure built to power it, build it, and run it.

4,535 MW

Total Pipeline Capacity

3,165

Acres Under Control

8

Powered Markets Under Control

Delivery Timeline

Megawatts, On the Clock.

TerraWatt’s pipeline is sequenced for delivery, not accumulation. More than 4 gigawatts of critical power is scheduled to reach ready-for-service status by the end of 2030, phased across the portfolio to match how hyperscale and AI demand actually lands, with additional pipeline behind it.

495

MW cumulative2027

2027

+495 MW

First deliveries across four markets

2028

+760 MW

Portfolio passes 1,000 MW

2029

+990 MW

Steady-state delivery cadence

2030

+1,120 MW

4,000+ MW scheduled & in service

Beyond 2030

+1,170 MW

Portfolio reaches 4,535 MW

Land positions across the Mountain West, Texas, the Gulf South, the Midwest, and the Northeast, anchored by a powered site in St. Louis.

Built by Operators. Backed by Conviction.

The team behind TerraWatt has spent careers delivering the exact infrastructure the industry is now trying to build at scale.